Monday, October 28, 2013

CQ WW SSB VE8EV SOSB(A)/10 HP


CQ Worldwide DX Contest, SSB

Call: VE8EV
Operator(s): VE8EV
Station: VE8EV

Class: SOSB(A)/10 HP
QTH: Inuvik, NT
Operating Time (hrs): 14

Summary:
 Band  QSOs  Zones  Countries
------------------------------
  160:                    
   80:    2     2        2
   40:    3     3        3
   20:    1     1        1
   15:    2     2        2
   10:  665    27       59
------------------------------
Total:  665    27       59  Total Score = 117,390

Club: 

Comments:
I decided two weeks ago that I was going to quit procrastinating and get my new home station built and on the air in time for CQWW this year.  After eleven frantic days of wiring, tower erecting, antenna work, furniture and amplifier moving, and equipment installation I was finally ready to go at 0500z Saturday night.  I decided I was just going to get everything working, have fun, and DX my way through what was left of the contest.  When I got on the air 10 meters was open over the pole and I decided right then and there to go single-band 10.  I've never heard conditions on ten meters like that from this part of the world and in the back of my mind I know there is a possibility I never will again.  The triple-play of low K-index, high SSN, and a big contest sure doesn't come around very often! 

After grabbing a handful of mults and a few hours sleep Saturday night the band was open again to Europe first thing Sunday morning so I spent the first few hours collecting more multipliers.  Once the propagation started shifting to the south I turned the big yagi towards the states and started running with a 200/hour!  By mid-afternoon Sunday 10 meters was jam packed right from the bottom all the way up past 29 MHz.  I alternated between running and collecting multipliers and then spent the last couple of hours beaming out to the Pacific picking up 3-pointers.

High point (other than 10m- wow!): After years of poor or non-existant internet access at the old hilltop contest site it was a nice treat to be able to go "assisted" and pick up a few extra multipliers from spots.

Low point: RF coming back into the shack and messing things up when I used the amplifier with the new 40m sloper.  Not a big deal for this contest but I better get it sorted out before Sweepstakes!

Day-by-day countdown of the station building exercise is on the blog http://ve8ev.blogspot.com

73
John VE8EV




Posted using 3830 Score Submittal Forms at: http://www.3830scores.com/

Friday, October 25, 2013

T-0: Ready or... NOT!

In the end I came pretty close to being ready but here it is Friday afternoon and I haven't even started moving equipment into the house yet. Nevertheless, I think there is a strong possibility I will be on the air by tomorrow evening. Pictures and a lengthy station description to follow tomorrow. Stay tuned!

Monday, October 21, 2013

T-4 Days: Up, Up, and Away!

I worked like a dog all weekend and all day today but the effort paid off.  When the crane finally arrived it was only in the driveway for 40 minutes.  The lift went smoothly and in no time at all the tower was standing securely in the front yard.

Antennas mounted, cables coiled up, and everything ready to go.
Up she goes!
Having the right tools for the job is very important.
I hate climbing towers but the guy wanted his crane back so someone had to go up and undo the strap...
Ready to rock and roll!  TH6DXX at 64 feet for 10/15/20m, VB64DX at 75 feet for 6m and, still strapped to the tower in this picture, a 40m wire sloper and a 30m delta loop.

Saturday, October 19, 2013

T-6 Days: A Stick in the Mud

I still can't get over this crazy weather.  10 degrees Celsius today when the normal high for this time of year is minus 7 and the low is minus -14!  You know, like winter. I'm even starting to appreciate all the mud because it really should be snow and ice.  Instead of a parka, I spent the day working in my shirtsleeves getting the base and the tower put together.

The old DMX tower has seen better days but I am installing all new hardware and it will be guyed instead of freestanding so should do the trick.  As promised, here are some pictures I grabbed right before dark.

Here is the base with the pins/ground rods installed.

















Thrust bearing and custom made top plate with guy anchor points.

















The truck is an integral part of the process to keep the business end of the tower high enough off the ground to get the antennas mounted.

Friday, October 18, 2013

T-7 days: A Week Away

The tower is ready to put together.  Over the last couple of days I fabricated the new top plate with thrust bearing, modified and mounted the rotor plate, and got all the miscellaneous hardware purchased.  The plan for Saturday is to build the base and completely assemble the tower at ground level.  It will be laid over the truck so I can mount the antennas on the mast.  On Sunday I will run all the coax cables, guy wires, and install the wire antennas- the 40m sloper and the 30m delta loop.  Pictures to follow tomorrow.

Wednesday, October 16, 2013

T-9 Days: Pulling Together the Pieces

Last couple of days saw the guy anchor platform built and the first couple of layers of paving stones laid, collected some assorted hardware, and started prepping all the tower sections.  I wanted to do a bit more but ran out of steam (and daylight) so will have to get cracking right after work tomorrow. 

The most important thing, though, is I booked the crane for next Monday and arranged to get that day off work, too.  Raising the tower is really the critical item so now that the crane is coming I need to get everything ready this weekend.  I want to have the entire tower and antennas put together with all the guys, wires, and cables strapped to the base and ready to lift into place. 

So much to do still but after putting this all together in my head a hundred times over the last two years I think we're good to go!